Scope of application
Device category, energy consumption, operating modes and transitional timelines
What we assess
We establish scope boundaries, exclusions and overlaps with other requirements, then determine the assessment route, evidence, tests and mandatory documentation.
What to prepare
- Technical description and intended use
- The key parameters listed above
- Models, manufacturer and applicant details
- Existing conformity evidence
What you receive
A requirements matrix for your product: scope, assessment route, necessary evidence and next actions.
Status and application dates
TR EAEU 048/2019 was adopted by EEC Council Decision No. 114 of 8 August 2019. The version amended on 8 July 2025 sets the general commencement date at 1 September 2028. Sections VII and VIII of Annex 16 have a separate condition tied to inclusion of test methods in the standards list, and cannot commence before that date.
Until commencement, applicable national and other product requirements must still be checked. Preparation requires the device category, use, power, operating modes and technical sheet. Readiness work for future requirements must not be presented as an already mandatory certificate under TR EAEU 048/2019.
ТР ЕАЭС 048/2019 — 08.07.2025 (PDF) ↗
Updated on 19 September 2026.
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
Request a consultation
Certification & engineering solutions