What we assess
We verify models, manufacturer identity and EAEU applicant status, assess factory reports and plan additional tests and bilingual labels. CE and Chinese documents are reviewed as input evidence, not automatic substitutes for EAEU approvals.
What to prepare
- Product catalogue
- Technical files and test reports
- Manufacturer and proposed applicant details
What you receive
A market-access plan by product group: applicant, approvals, tests, translations and labels.
Factory records and EAEU market entry
We reconcile Chinese and export product names, models, factory and brand. The EAEU applicant and any required representative authority are established. Differences between the contract, reports and labelling are addressed before submission.
Factory reports are reviewed for model coverage, methods and suitability for the selected scheme. CE, CCC and overseas reports do not automatically replace EAC documentation. Samples, translations, instructions and labelling are planned before the first shipment.
Service questions
Must the entire factory archive be translated?
First establish the dossier scope. Translate the necessary records and reconcile terminology and model names.
Can preparation start before the shipment is ready?
Yes. An early design and document review identifies sample and labelling requirements in advance.
Sources & regulatory basis
Updated on 19 September 2026.
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
Request a consultation
Certification & engineering solutions