Scope of application
Composition, substance identity, hazard classification and safety data sheet
What we assess
We establish scope boundaries, exclusions and overlaps with other requirements, then determine the assessment route, evidence, tests and mandatory documentation.
What to prepare
- Technical description and intended use
- The key parameters listed above
- Models, manufacturer and applicant details
- Existing conformity evidence
What you receive
A requirements matrix for your product: scope, assessment route, necessary evidence and next actions.
Status and application dates
Adopted by EEC Council Decision No. 19 of 3 March 2017. Decision No. 61 of 1 August 2025 was published on 11 September 2025; its general effective date is 11 October 2025, with separate conditions for register and notification provisions.
The effective date of Decision No. 61 does not automatically commence every requirement of TR EAEU 041/2017. For a shipment, we check procedural commencement conditions and applicable sanitary rules. A planned date must not be presented as an established mandatory filing date.
Updated on 19 September 2026.
Sources & regulatory basis
Timing & cost
Quoted after reviewing models, manufacturers, testing scope, site visits and translation needs. The proposal separates the stages and their deliverables.
Request a consultation
Certification & engineering solutions